 |
| Mutli-Forum Chat |
• Popup Chat •
This shoutbox is shared among several forums. Remember that some of the users chatting are members of other forums. Please be courteous and treat everyone in the shoutbox with the extra care you would for any guest in your home. 
Multi-Forum Chat sponsored by:
|
| Top Games |
 | Tetris3 Played: 137 |  | Wheel of fortune Played: 98 |  | Monkey Dive Played: 75 |  | Map Test Played: 44 |  | Catbowling Played: 38 |  | Pyramid solitaire Played: 22 |  | Super mario2 Played: 20 |  | Shooting gallery Played: 18 |  | Kab00m Played: 18 |  | Paraglyder Played: 18 | |
|
|  |
| Author |
Message |
Tumbleweed
Admin

Thanks: 0
Thanked 0 Times in 0 Posts
 votes: 4
|
Posted: Wed Aug 22, 2007 7:52 pm Post subject: US armored vehicles slow to reach Iraq |
|
|
This is crazy. They now how bad these troops need these armored vehicles.
By LOLITA C. BALDOR, Associated Press Writer
| | | Quote:WASHINGTON - The Pentagon will fall far short of its goal of sending 3,500 lifesaving armored vehicles to Iraq by the end of the year. Instead, officials expect to send about 1,500.
Pentagon press secretary Geoff Morrell said Wednesday that while defense officials still believe contractors will build about 3,900 of the mine-resistant, armor-protected vehicles by year's end, it will take longer for the military to fully equip them and ship them to Iraq.
"Production is on pace, the issue is delivery," he said, adding that the lag is a disappointment and the Defense Department is still committed to getting as many of the vehicles to the war as quickly as possible.
The vehicles — known as MRAPs — have a special V-shaped hull that provides greater protection against roadside bombs. According to the military, no troops have been killed while riding in one.
Once the MRAPs are built, the military installs necessary military equipment — such as radios and radar — then sends them to Iraq. Right now that process is taking about 50 days, but officials hope to shorten that to a little more than a month.
Still, Morrell said that many of the MRAPs produced in November and December won't get to Iraq before the end of the year. He said getting 3,500 to the forces in Iraq by year's end was an "ambitious goal" but the revised estimate of 1,500 is more realistic now.
Currently many of the MRAPs are being flown to the Middle East, in an effort to get them into Iraq more quickly. But as production rates increase, the Pentagon is likely to send them by ship — which takes longer but is less expensive and can deliver many more at one time.
The contractors are Stewart and Stevenson Tactical Vehicle System LP, a division of Armor Holdings Inc.; BAE Systems Plc; Force Protection Industries Inc.; General Dynamics Corp.; and Navistar International Corp.'s subsidiary International Military and Government LLC.
Earlier this year, production was a problem in the Pentagon's struggle to get more MRAPs to Iraq. In a late June report, the Defense Department's inspector general found that the Pentagon awarded contracts for the vehicles to companies that failed to produce them on time, despite knowing that there were other contractors who could have supplied some more quickly. Force Protection Industries was one of the companies in the report noted for delays. |
 |
Source |
|
 |
|
|
|
Page 1 of 1
|
|
All times are GMT - 5 Hours
|
|
Display posts from previous:
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You can vote in polls in this forum You can password protect topics in this forum
You can topic ban in this forum You can prevent guests in topics in this forum You can attach files in this forum You can download files in this forum
|
|  |